Beheira
67 documented cases in the Forced Eviction Monitor.
Case log (67)
All cases in the monitor →| # | Status | Governorate | Date | Area | Affected | Category | Targeted project | |
|---|---|---|---|---|---|---|---|---|
| 41 | Kafr El Dawar ViaductKafr El Dawar · El Malqa and Qombaniya Luqin | Beheira | 2021-01-01 | 2.72 feddan | 156 people39 families | Roads and Bridges | Kafr El Dawar Viaduct - Kafr El Dawar | Details |
| 42 | Saleh Basin No. 1, Second Section, ShaabanDamanhour Markaz · Zawyet Ghazal | Beheira | 2021-01-01 | 9.51 feddan | 4 people1 families | Water Supply, Sanitation and Agriculture | Wastewater Treatment Plants in Zawyet Ghazal - Damanhour | Details |
| 43 | Plot No. 8 Basin, First SectionDamanhour Markaz · Sanhour | Beheira | 2021-01-01 | 2.50 feddan | 24 people6 families | Water Supply, Sanitation and Agriculture | Sanhour - Damanhour Wastewater Treatment Plants | Details |
| 44 | Al-Nashwa Al-Qibliya and Al-Ramalak Basin No. 3Damanhour Markaz · Sharnoub | Beheira | 2021-01-01 | 6.78 feddan | 56 people14 families | Water Supply, Sanitation and Agriculture | Sharnoub - Damanhour Wastewater Treatment Plants | Details |
| 45 | Al-Sirafi Level Crossing Bridge – RashidRashid · Rashid City - Al-Sirafi Level Crossing | Beheira | 2021-01-01 | 2.76 feddan | 84 people21 families | Roads and Bridges | Al-Sirafi Level Crossing Bridge - Rashid | Details |
| 46 | Al-Ratma Basin No. 2, Sixth Hassan SectionKafr El-Dawar · Yulin - Churches | Beheira | 2021-01-01 | 13.80 feddan | 12 people3 families | Water Supply, Sanitation and Agriculture | Kafr El-Dawar Central Wastewater Treatment Plants - Kafr El-Dawar | Details |
| 47 | South of the Dabaa axis – Wadi El NatrounWadi El Natroun · Alexandria - Borg El Arab, Beheira - Wadi El Natroun - Marsa Matrouh - Dabaa | Beheira | 2021-01-01 | 392.86 feddan | — | Water Supply, Sanitation and Agriculture | New Delta Project - Matrouh, Alexandria and Beheira | Details |
| 48 | استكمال تنفيذ الامتداد الغربي لطريق ميناء أبو قيرمركز كفر الدوار · مركز كفر الدوار | Beheira | 2020-04-30 | 11.71 feddan | 88 people22 families | Roads and Bridges | الامتداد الغربي لطريق ميناء أبو قير | Details |
| 49 | وصلة كوبري فوة دمنهور – دمنهوردمنهور · دمنهور | Beheira | 2020-01-01 | 71.00 feddan | 1,000 people250 families | Roads and Bridges | وصلة حرة لربط كوبري فوة بمحور الليثي بدمنهور | Details |
| 50 | إنشاء كوبري علوي أعلى مزلقان أبو حمصأبو حمص · أبو حمص | Beheira | 2020-01-01 | 3.00 feddan | 72 people18 families | Roads and Bridges | كوبري علوي أعلى مزلقان أبو حمص | Details |
| 51 | وصلة كوبري فوة دمنهور – دمنهوردمنهور | Beheira | 2020-01-01 | 71.00 feddan | 1,000 people250 families | Roads and Bridges | وصلة حرة لربط كوبري فوة بمحور الليثي بدمنهور | Details |
| 52 | مدرسة كوم حماده الثانوية الصناعية للبناتمركز كوم حماده | Beheira | 2019-12-19 | 0.03 feddan | 4 people1 families | Education Infrastructure | نزع ملكية العقار الذى تشغله مدرسة كوم حماده الثانوية الصناعية للبنات | Details |
| 53 | ازدواج طريق جناكليس الصحراويمركز ابو المطامير | Beheira | 2019-11-07 | 68.60 feddan | 920 people230 families | Roads and Bridges | ازدواج طريق جناكليس الصحراوي | Details |
| 54 | مدرسة إدكو الاعدادية للبنات بالبحيرةمركز ادكو | Beheira | 2019-08-22 | 0.44 feddan | 16 people4 families | Education Infrastructure | نزع ملكية العقار الذى تشغله مدرسة إدكو الاعدادية للبنات بالبحيرة | Details |
| 55 | School – in Sheikh Zarif Basin No. (10), Section TwoAl-Rahmaniya Markaz · in Sheikh Zarif Basin No. (10), Section Two | Beheira | 2018-10-04 | 0.26 feddan | 160 people40 families | Education Infrastructure | For educational purposes | Details |
| 56 | School – located on plot number (20) in the Rizqah Al-Badourah basin (13), first section, in the Laqana areaShubrakhit Markaz · located on plot number (20) in the Rizqah Al-Badourah basin (13), first section, in the Laqana area | Beheira | 2018-09-27 | 0.86 feddan | 144 people36 families | Education Infrastructure | For educational purposes | Details |
| 57 | School – Al-Jarwana Basin No. 1, in the Takla Island areaShubrakhit Markaz · Al-Jarwana Basin No. 1, in the Takla Island area | Beheira | 2018-06-14 | 0.28 feddan | 28 people7 families | Education Infrastructure | For educational purposes | Details |
| 58 | School – Kom HamadaKom Hamada Markaz · In the Kom Hamada area | Beheira | 2018-05-26 | 0.22 feddan | 4 people1 families | Education Infrastructure | — | Details |
| 59 | كفر الرحمانيةمركز المحمودية · مركز المحمودية | Beheira | 2017-10-07 | 3.57 feddan | 64 people16 families | Roads and Bridges | تنفيذ المرحلة الاولي من مشروع إنشاء وصلة حرة لربط كوبري فوة على… | Details |
| 60 | نظارة السعيديةمركز المحمودية · مركز المحمودية | Beheira | 2017-10-07 | 57.64 feddan | 304 people76 families | Roads and Bridges | تنفيذ المرحلة الاولي من مشروع إنشاء وصلة حرة لربط كوبري فوة على… | Details |
| 61 | قرية دسيا الكنايسمركز المحمودية · مركز المحمودية | Beheira | 2017-10-07 | 67.43 feddan | 120 people30 families | Roads and Bridges | تنفيذ المرحلة الاولي من مشروع إنشاء وصلة حرة لربط كوبري فوة على… | Details |
| 62 | قرية الروضةمركز دمنهور · مركز دمنهور | Beheira | 2017-10-07 | 4.34 feddan | 64 people16 families | Roads and Bridges | تنفيذ المرحلة الاولي من مشروع إنشاء وصلة حرة لربط كوبري فوة على… | Details |
| 63 | قرية سرنبايمركز المحمودية · مركز المحمودية | Beheira | 2017-10-07 | 57.49 feddan | 308 people77 families | Roads and Bridges | تنفيذ المرحلة الاولي من مشروع إنشاء وصلة حرة لربط كوبري فوة على… | Details |
| 64 | أبوعون – حوض أبوعون نمرة 1 – قسم أولشبراخيت · أبوعون – حوض أبوعون نمرة 1 – قسم أول | Beheira | 2014-09-04 | 0.65 feddan | 4 people1 families | Education Infrastructure | نزع ملكية أرض ومباني مدرسة أبوعون الإعدادية | Details |
| 65 | كوم حفينأبو المطامير · كوم حفين | Beheira | 2014-03-13 | 2.04 feddan | 24 people6 families | Roads and Bridges | تطوير الطريق الصحراوي مصر - الاسكندرية | Details |
| 66 | المهديةأبو المطامير · المهدية | Beheira | 2014-03-13 | 142.53 feddan | 188 people47 families | Roads and Bridges | تطوير الطريق الصحراوي مصر - الاسكندرية | Details |
| 67 | خارج الزمامأبو المطامير · خارج الزمام | Beheira | 2014-03-13 | 144.32 feddan | 104 people26 families | Roads and Bridges | تطوير الطريق الصحراوي مصر - الاسكندرية | Details |
Forced Eviction Monitor
Document a new case
Help us track expropriation and eviction cases. Submissions are reviewed by the monitor team before publication, and contact details are never published.
